Lynas, from the Mount Weld mine to Malaysia and Kalgoorlie

How Lynas's chain from a Western Australian mine to processing plants in Kalgoorlie and Malaysia was financed and licensed, and what it sells, as its filings and regulators record it.

Reviewed by Peter Uppal

Tabletop model: a heap of brown grains on a stone slab, two trails leading to a small dark shed nearby and across a strip of water to an identical shed.
Illustrative artwork: one source of concentrate feeding two processing sites, one across the water, of no particular place. Not a facility, equipment or material connected to this project. · Illustration · Osmond Hub

The short version

Lynas mines a rare earths concentrate at Mount Weld in Western Australia and, according to its 2026 annual report, in the year to 30 June 2026 cracked and leached it both at Kalgoorlie and at its plant at Gebeng, Malaysia, where it also separates and finishes products. Lynas reported 13,089 t of ready-for-sale rare earth oxide produced in the year to 30 June 2026, including 7,260 t of NdPr. On 2 March 2026 Lynas announced that its Malaysian operating licence had been renewed for ten years from 3 March 2026, with the formal licence then still to be issued.

One mine, two processing countries

Two framed coastline insets, the Malay Peninsula on the left and south-western Australia on the right, with a long arrow from a pin in Australia across to a pin on the peninsula's east coast and a short arrow to a nearby pin to its south-west.
Illustrative diagram: Lynas's mine and its two processing sites in FY26, with Mount Weld feedstock supplying both; not to scale. Not a facility, equipment or material connected to this project. · Illustration · Osmond Hub

Lynas mines and produces a rare earths concentrate at Mount Weld (Mt Weld) in Western Australia(opens in a new tab), and its 2026 annual report says Mt Weld feedstock supplies both Lynas Malaysia and the Kalgoorlie facility(opens in a new tab).

In FY26 (Lynas's financial year ends 30 June), by the company's account, it cracked and leached concentrate both at its Kalgoorlie Rare Earths Processing Facility, which produces a mixed rare earth carbonate (MREC) and was still ramping up, and at its Malaysian plant in Gebeng(opens in a new tab). Cracking and leaching are the first chemical steps, which break down the concentrate and take its rare earths into solution. Lynas's 2026 annual report describes the Gebeng plant as carrying out cracking and leaching, solvent-extraction separation and product finishing(opens in a new tab).

Mt Weld feedstock supplies both Lynas Malaysia and the Kalgoorlie facility, Lynas's 2026 annual report says.

Licensed in Malaysia, on conditions

On 15 February 2023 Malaysia's Ministry of Science, Technology and Innovation (MOSTI) announced that the Atomic Energy Licensing Board (AELB) had renewed Lynas's licence for three years, from 3 March 2023 to 2 March 2026(opens in a new tab). MOSTI's 15 February 2023 statement said AELB had rejected Lynas's application to remove four licence conditions, including the one on importing lanthanide concentrates from Australia(opens in a new tab). In that statement the Minister said no cracking and leaching would be carried out at Gebeng after July 2023(opens in a new tab).

In October 2023, The Star reported, the science minister announced revised terms allowing Lynas Malaysia to import lanthanide concentrate until its licence expired, subject to a condition on the radioactivity of its water-leach purification (WLP) residue(opens in a new tab).

On 2 March 2026 Lynas announced that the regulator, which it names the Department of Atomic Energy, had renewed Lynas Malaysia's operating licence for ten years from 3 March 2026(opens in a new tab), with the formal licence then still to be issued. Berita RTM gave the end date as 2 March 2036, with the renewal made by MOSTI through the Atomic Energy Department(opens in a new tab), its own name for the regulator. Malaysia's science minister also told a press conference that day that the renewal kept a requirement for Lynas to put 1% of annual gross sales into R&D(opens in a new tab), as reported by RTM on 2 March 2026.

Lynas describes one condition of the 2026 licence in its annual report: it must implement an alternative cracking process so the plant no longer produces WLP residue above 1 Bq/g (becquerels per gram) after 2 March 2031, with modification to start by March 2028(opens in a new tab), and the company says the licence may be revoked for non-compliance.

Lynas's annual report of 26 August 2026 records that it cracked and leached concentrate at its Malaysian plant in Gebeng in FY26(opens in a new tab). The documents cited here do not say whether the 2023 position was later revised.

Japanese money, renegotiated

Lynas describes its partnership with Japan Australia Rare Earths B.V. (JARE) as having served both organisations "over the past 15 years"(opens in a new tab); JARE is a special purpose company established by JOGMEC and Sojitz Corporation(opens in a new tab). A September 2022 Lynas announcement refers back to an "Availability Agreement announced 20 March 2011"(opens in a new tab) with JARE, concerning supply rights.

According to Lynas's 5 September 2022 announcement, the senior loan facility then had a principal balance of US$141 million at 2.5% a year interest, maturing 30 June 2030; JARE would provide US$9 million through a share subscription to fund exploration at Mt Weld; and priority supply rights to Japan to 2038 were unchanged(opens in a new tab). In an announcement dated 7 March 2023, JARE agreed to subscribe A$200 million of Lynas shares, which Lynas said may fund projects to increase light and heavy rare earth production, and to forgo US$11.5 million of deferred 2016 interest under the existing loan(opens in a new tab).

At 30 June 2026 the JARE loan was US$90m principal (face value A$130.8m), with a carrying amount of A$119.7m (FY25 A$151.3m), repayable between 31 December 2026 and 30 June 2030(opens in a new tab). Lynas announced that a further agreement of 10 March 2026 runs to 2038, with a firm JARE commitment of 5,000 t a year of NdPr, a floor of US$110/kg NdPr for sales to Japanese industry, and JARE buying the equivalent of 50% of Lynas's heavy rare earth oxides at prices and terms that, in Lynas's words, "represent no opportunity loss to Lynas"(opens in a new tab).

What leaves the plants

A brown heap at the lower left feeds two rows on a bench: a heated stirred tank leading to a heap of buff powder on a shelf above, and a heated stirred tank, three linked settling tanks and three identical closed jars along the bottom.
Illustrative diagram: what Lynas's 2026 annual report says each plant did in FY26; the documents cited do not say where Kalgoorlie's carbonate goes next. Not a facility, equipment or material connected to this project. · Illustration · Osmond Hub

As of its 2026 annual report, Lynas's separated products include NdPr and the heavy rare earth oxides dysprosium and terbium, as well as samarium, which Lynas classes as a heavy rare earth oxide; gadolinium is expected in early FY28 and yttrium in early CY28, and lutetium is planned(opens in a new tab). As of the annual report of 26 August 2026, samarium oxide was first produced in March 2026, with initial orders expected to be fulfilled in Q1 FY27(opens in a new tab).

In FY26 Lynas produced 13,089 t of ready-for-sale REO including 7,260 t of NdPr(opens in a new tab), and sales were 12,122 t REO including 7,337 t NdPr(opens in a new tab).

As of the June 2026 quarter, Lynas put the estimated cost of its Malaysian heavy rare earths expansion at about A$294m including contingency, up from about A$180m, with first gadolinium expected in early FY28(opens in a new tab).

The American thread

As of its June 2026 quarterly report, Lynas has had a contract with the US Government relating to US rare earths supply chain resilience since 2021(opens in a new tab). Its 2026 annual report says the planned Texas heavy rare earth facility will no longer proceed(opens in a new tab); the letter of intent of 16 March 2026 says the original agreement was modified because of significant uncertainty over whether the Seadrift, Texas facility would be built(opens in a new tab).

The 16 March 2026 letter, signed with the US Department of War, as Lynas names it, is a binding letter of intent for about US$96m of light and heavy rare earth oxides over four years, with an NdPr oxide floor price of US$110/kg(opens in a new tab). As of the annual report of 26 August 2026, Lynas still described it as a binding Letter of Intent(opens in a new tab), with further heavy rare earth supply under discussion and a definitive agreement still pending at that date.

A proposed acquisition

On 1 October 2026 Lynas signed a binding Scheme Implementation Deed to acquire Meteoric Resources, owner of the Caldeira ionic clay rare earth project in Minas Gerais, Brazil, for 0.0207 new Lynas shares per Meteoric share, with implementation expected, on an indicative timetable, by March 2027, subject to conditions including shareholder, Court and Brazilian regulatory approvals(opens in a new tab). As of 26 October 2026 the acquisition was proposed and pending.

Related

  • Processing Centres — Lynas's Kalgoorlie and Gebeng plants among the world's processing sites
  • Countries — Australia and Malaysia as processing countries
  • Government Agencies — the Malaysian regulator and the Japanese and US bodies named here
  • Regulation — how licence conditions shape a processing plant
  • Supply Chain Risk — what one large producer outside China means for supply

Sources